Saturday, December 31, 2011

French drain

On Friday they buried the pipes for the French drain.



This is about where the bathroom attached to the smaller bedroom will be.



They filled and leveled between the footings.  The plan is to set the forms for the basement walls on Monday and pour them on Tuesday.

Brad walking through what will be the living room downstairs.

Its a little easier to tell how big the rocks are with Brad walking on them. 

No comments:

Post a Comment